Site icon IntoBharat

“Bihar Accelerates into the Future: Bullet Train Project Unveiled with Station Construction Underway”

Patna: The Vande Bharat semi high-speed train, also known as the Bullet Train, has commenced operations across the country. The process of operating these trains has gradually begun in different parts of the country. The Bullet Train, which runs on Japanese technology, is known for its high speed. Extensive work is being carried out to ensure the smooth operation of these trains, including the development of stations, land for tracks, and other necessary facilities. Exciting news has emerged from Bihar, as the people of the state will soon have the opportunity to experience this high-speed Bullet Train.

Preparations are underway to operate the Bullet Train from Delhi to Howrah, with the train passing through Bihar. The major areas that will benefit from this project include Arrah, Patna, and Gaya. This development signifies the realization of the long-awaited dream of having a Bullet Train in Bihar.

Aerial surveys have already been conducted, and ground surveys are currently in progress. The National High-Speed Rail Corporation Limited (NHSRCL) has finalized the route for this project, putting an end to any confusion. The construction of stations for the Bullet Train in Bihar will take place in Buxar, Arrah, Udwantnagar, Patna, and Gaya. Survey work is currently being carried out in Bhojpuri, specifically in Ara.

Ideal Impression Market Research is the company responsible for conducting the survey. They are engaging with the residents of Udwantnagar, providing them with information and details about the project. Additionally, the company is seeking the consent of the people regarding this initiative. The Bullet Train project is part of the larger plan connecting Varanasi and Howrah, which extends from Delhi to Howrah.

Furthermore, surveys are also being conducted for the Delhi to Varanasi route via Lucknow and Ayodhya. Once the Bullet Train service is operational, the travel time from Arrah to Howrah will be reduced to just three hours. Similarly, the distance between Varanasi and Howrah will be approximately three and a half hours.

Following the social and economic survey, the soil testing process for the bullet train will commence in such circumstances. Once this task is finished, the land acquisition process will commence. The acquisition of land for this route will also commence by 2025. Additionally, regulations have been formulated concerning the compensation amount in this scenario. The bullet train will have regulations for elevated routes, underground routes, and at-grade tracks, which are tracks on flat ground.

Exit mobile version